We are happy to be checked. Auditors and customers are welcome to walk the production lines, witness lab testing, and review our ISO 9001, ISO 14001 and IATF 16949 processes — and we prepare the audit package in advance so the visit answers questions rather than raising them. This page explains what an audit here covers and what documentation is ready for it.

Why an Audit Should Be Routine, Not a Favour

A factory audit exists to answer one question the catalogue cannot: will the hundredth container match the first. That is a process question, not a sample question, and it is answered by looking at how material is controlled, how parameters are recorded and what happens when something is out of specification.

Buyers sometimes treat the audit as a formality squeezed in before a first order. It is more useful earlier, while the specification is still flexible — a process constraint found during the audit is a design input, whereas the same constraint found after the first batch is a change order.

What a Visit Covers

A visit walks the whole sequence rather than a show line. Cell production covers electrode coating, cell assembly, formation and grading. PACK work covers cell inspection and sorting, module welding, BMS installation, testing and system integration. Each station has its own inspection points: incoming material inspection, cell voltage and consistency checks, component and BMS inspection, assembly process inspection, welding and connection quality checks, charge-discharge testing, BMS function verification, appearance and structural inspection, and finished-product performance testing before final inspection.

The independent testing laboratory is part of the route, not a separate appointment. It runs charge-discharge cycling, thermal runaway, vibration, IP rating and salt spray testing, with test chambers for both cell-level and system-level validation. Witness testing is available at customer request, which means the test is run while you watch rather than reported to you afterwards.

It is also worth separating the audit into two passes. The first walks the process and asks whether the controls described in the quality manual are actually the ones in use on the floor — the gap between the two is the single most useful thing a visit can reveal. The second follows one unit, or one batch, through its paperwork from incoming cell lot to final inspection record, which tests whether the traceability chain survives contact with a real order rather than a demonstration.

Both passes are welcome here, and both are easier to run when the product scope is known in advance, because the records we pull depend on which line and which platform you are evaluating.

The Evidence Pack

Documentation is prepared before the visit so the time is spent on the floor rather than in a meeting room. The package covers the management systems — ISO 9001, ISO 14001 and IATF 16949 — and the product-level basis of CE, UL 1973, IEC 62619, UN38.3 and RoHS. Certificates are available for customer audit.

It is worth being clear about what each document type proves. The management system certificates speak to whether the factory can make the product consistently. Product safety standards speak to behaviour in normal and abnormal use. UN38.3 is the transport entry requirement, and what carriers actually ask for is the test summary naming the exact cell and battery type, plus the safety data sheet and, for sea freight, the transport identification report. None of these substitutes for another, and a certificate list that mixes them is how a gap gets discovered at customs instead of at quotation.

Traceability From Cells to Finished Systems

Traceability is what makes a warranty claim answerable years later. The chain runs from incoming cell lots through sorting and grouping, through the PACK and its BMS configuration, to the finished system and the inspection records attached to it. For customised products the inspection points are adjusted to the design, and those adjusted points are recorded the same way.

If your market requires a specific traceability format, or your own quality system needs records in a particular structure, raise it at the audit rather than at the first shipment — the records are generated during production, and retrofitting a format afterwards means reconstructing rather than recording.

Two questions are worth asking during the visit because they cannot be answered from certificates. First, what happens to a unit that fails an inspection point — the answer tells you whether the quality system has a disposition process or whether failures are simply reworked quietly. Second, which parameters are recorded automatically and which are written by hand, because the second category is where consistency actually erodes between batches.

Neither question requires access to anything confidential. Both tell you more about a factory than the certificate folder does, which is the reason a visit is worth the travel when the product is going into a multi-year programme.

Booking an Audit

Visits are welcome year-round. To make one productive, tell us the product scope you are evaluating, the markets you intend to sell into so the right certificate set is pulled, the specific processes you want to witness, and whether you need witness testing scheduled during the visit. We will prepare the evidence pack against that scope and confirm the agenda before you travel.